Types of floor screed

Floor screed – one of the stages of construction, repair work. Floor plastering with your own hands is quite possible, the work does not require any specific skills, you just need to carefully read the sequence of its implementation.

Types of screed

Before starting the work, it should be decided what kind of screed to give preference. Each of the options has its own nuances, which should be carefully studied and choose the optimal one for the room where the work is done. There is concrete, with self-leveling surface, dry. For any type of material, first of all, you need a preliminary preparation of the surface that will go under the screed. Conditions – an even, clean, dry surface, if necessary, the previous floor covering is dismantled. The floor is cleaned from debris, dust, remove any paint or oil stains, if any. Further, using a horizontal level, or any other tool for such works, the height is determined and guidelines, or as professionals say, “beacons. This step is common for any type of material used.

Concrete

Concrete floor screed with their own hands, it is also called wet, the most common option. Its advantages – the simplicity of technology and the relative cheapness of the material used. For concrete screed will need sand, cement, water, a small amount of plasticizers and a metal or plastic mesh to give strength to the floor. You can buy ready-made factory mix, which will greatly facilitate the process and save time (you do not have to mix the mortar yourself). It is worth considering how long the concrete screed dries. According to regulatory requirements, the process of complete drying takes 28 days. This point must be taken into account.

Self-leveling

Even easier and faster floor screed with your own hands will be made of self-leveling materials. The construction market offers a fairly large selection of mixes for this type of work. The technology of laying with self-leveling materials is even easier than concrete. The solution is prepared. Usually a detailed instruction is attached to each package with a mixture. The ready mixture is poured over the surface of the floor, leveled with the help of a distributing roller. To find out exactly how long the screed dries, it is worth carefully reading the manufacturer’s recommendations. Usually, the packing bag is always accompanied by a detailed instruction, which will fully acquaint you with all the stages of the mixture and the laying process. It is worth taking into account the thickness of the layer and the temperature in the room where the work is carried out. On average, a complete drying takes 10-12 hours.

Dry

The method is relatively young, but has already won a lot of positive feedback. A huge advantage is that this type of floor installation does not require additional time to dry the floor. Dry screed flooring with their own hands takes place, just like the previous types, in several stages. On a flat, prepared surface is laid waterproofing. Along the perimeter of the room, a damping tape is attached, which will help prevent the appearance of cracks in the floor covering during seasonal temperature and humidity fluctuations. After that, the base layer is laid. Builders recommend a fine-grained slag, sand. After laying the dry screed, you can immediately proceed to the following works, but it is better to give the floor to stand at least a couple of days. Actually this is the whole process of screed floor from any kind of material. In fact, there is nothing complicated. In the presence of good materials, any owner can cope with this type of work independently. (1 ratings, average: 4.00 из 5)